Спасибо ваша заявка принята

Back

In the Aktobe region drilling works are in full swing.

Drilling works are carried out by Aurora Minerals Group LLP jointly with S-Geo Project LLP. Drilling is carried out using core drilling method, the location of the wells was determined by the results of the interpretation of previous airborne geophysical surveys.

Drilling works are planned to be completed in November, the amount of drilling works is more than 5000 linear meters.